Camp Victory, Baghdad, Iraq
Northrop Grumman Information Systems, Manassas, Virginia, USA
Mechron personnel were involved in the design of the power system equipment and materials to support new telecommunications infrastructure at Camp Victory, Iraq. Two locations required unique solutions due to the amount of load and site conditions. The design had to meet local requirements and adhere to North American standards for safety and environmental protection.
Due to the shortage of US Army transport resources, we were also tasked with the transportation of all materials to site. This involved the coordination, export compliance and shipping of materials by air and land from Canada, The United States of America, The United Kingdom, Spain, and the United Arab Emirates to Camp Victory in Baghdad.